Solar Panels and Batteries Before Demolition in Melbourne

A growing share of the houses we demolish across Melbourne have solar panels on the roof, and more of them now have a home battery on the garage wall as well. Owners are often surprised to learn that none of it can simply come down with the roof. A solar system has to be made safe and removed before demolition starts, and the decisions you make about it can affect both your schedule and what you get back.

This guide covers what has to happen, who does it and what your options are. It is general information, so confirm the specifics for your system with a licensed electrician or solar installer.

Why solar cannot come down with the roof

Turning off the main switch does not make a solar array safe. Panels produce voltage whenever light reaches them, so the cabling between the panels and the inverter can still be live on a perfectly ordinary overcast day. Pulling a roof apart with an excavator while that wiring is energised creates a real risk of shock and fire for anyone on site.

For that reason the system has to be isolated and disconnected by a licensed electrician, ideally one experienced with solar, before the roof is touched. That is electrical work, not demolition work, and it should never be attempted by an owner or a general labourer.

Home batteries need extra care

A home battery stores a significant amount of energy, and a damaged lithium battery can catch fire in a way that is hard to put out. Batteries should be shut down and disconnected by a licensed electrician, then removed from site whole, well before any machine is near the garage or wall they are mounted on. Never leave a battery in a building that is about to be demolished on the assumption it will be dealt with on the day.

How it fits with service abolishment

Your electricity supply has to be abolished before demolition, not just switched off at the meter. A property with solar adds steps to that process, because the system is connected to the grid and is usually tied to a retailer agreement and a feed-in arrangement. Tell your retailer and distributor that the house has solar when you lodge the abolishment request, and have the system disconnected first so it is not the item holding up the job. Our guide to service abolishment timelines in Melbourne explains the wider sequence and why electricity is so often the longest lead time.

Your options for the system

Once the system is off the roof, there are three realistic paths.

The first is to reinstall it on the new house. That can work well for a newer system that is still in good condition, but talk to your builder and a solar installer before you commit. The new roof design, orientation and electrical layout may not suit the old panels, warranties may not carry over, and the cost of removal, storage and reinstallation can approach the cost of a new system for older equipment. If you do keep it, the panels and inverter need to be stored somewhere dry and secure for the whole build.

The second is to sell or give the system away. Working second-hand panels have a market, particularly for sheds and off-grid uses, and a careful removal keeps that option open.

The third is recycling. Victoria does not allow electronic waste, including solar panels, inverters and batteries, to go to landfill. Panels and inverters should go to a facility that accepts them, and batteries to an appropriate battery recycler. They are kept out of the general demolition waste stream entirely, in the same way that asbestos is.

Solar hot water and other roof equipment

Solar hot water systems are a separate item. Roof-mounted collectors and any tank on the roof need draining and removal, and some systems contain heat transfer fluid that has to be handled properly. Heat pump hot water units and split-system air conditioners contain refrigerant, which should be recovered by a licensed refrigeration technician before the units are removed. These are all straightforward jobs when they are booked in advance and awkward ones when they are discovered on demolition day.

Check what is under the panels

On an older Melbourne house, solar panels are sometimes mounted on a roof that contains asbestos cement sheeting, particularly on garages, carports and rear extensions. Removing the panels from that kind of roof needs to be planned with the asbestos in mind, because drilling, cutting or breaking the sheeting disturbs it. Our Asbestos Removal & Disposal service covers the licensed removal that follows, and the wider list of hidden hazards is set out in our guide to hazardous materials beyond asbestos.

Getting the order right

The sequence that works on most jobs is simple. Decide whether you want to keep, sell or recycle the system. Book a licensed electrician to isolate and remove the panels, inverter and any battery. Lodge the electricity abolishment, mentioning the solar. Arrange refrigerant recovery and hot water removal. Then the asbestos removal and the demolition itself can follow without anything live left on the roof.

Planning a demolition with solar on the roof

Our House & Unit Demolition service includes working through the roof equipment at the site visit, so that the solar, battery and hot water are listed in the program from the start rather than discovered on the day. We demolish across Melbourne's northern, western, south-eastern and outer eastern suburbs, and on the Mornington Peninsula.

If your house has solar and you are planning a knockdown-rebuild, get in touch early. We will tell you what has to be removed before we can start, who needs to do it, and how to fit it into your timeline.

Get a Free Quote

Get the block cleared properly.

Free on-site quotes · Permits and abolishment handled · Melbourne-wide

Request a Quote